EvaluationBestPractice: Difference between revisions

From Open-Xchange
No edit summary
No edit summary
Line 7: Line 7:
** documentation overview
** documentation overview
** ProofOfConcept (POC) planning
** ProofOfConcept (POC) planning
*** Goal: 1-server OX-installation in target-environment connected to existing mail-accounts and administered manually
*** Goal: single-server OX-installation in existing target-environment connected to existing mail-accounts and administered manually
(insert Link to article describing POC Requirements / Deliverables)
(insert Link to article describing POC Requirements / Deliverables)


Line 13: Line 13:


1. installed by customer
1. installed by customer
* link to install-documentation
* review-webcast
2. installed by OX
2. installed by OX
* requirements
* requirements
Line 18: Line 21:
* handover-webcast
* handover-webcast


customer is able
* customer evaluates the product
 
* feedback-webcast (approx. 4 weeks later)

Revision as of 10:09, 29 December 2011

insert bla here

  • request Questionnaire (insert link here)
  • initial webcast (polish existing slides, add stuff required for POC)
    • product positioning
    • architecture overview
    • documentation overview
    • ProofOfConcept (POC) planning
      • Goal: single-server OX-installation in existing target-environment connected to existing mail-accounts and administered manually

(insert Link to article describing POC Requirements / Deliverables)

  • setup the POC

1. installed by customer

  • link to install-documentation
  • review-webcast

2. installed by OX

  • requirements
  • (remote) installation
  • handover-webcast
  • customer evaluates the product
  • feedback-webcast (approx. 4 weeks later)