EvaluationBestPractice: Difference between revisions
From Open-Xchange
Karsten.will (talk | contribs) No edit summary |
Karsten.will (talk | contribs) |
||
Line 9: | Line 9: | ||
= Initial Webcast = | = Initial Webcast = | ||
(polish existing slides, add stuff required for POC) | (polish existing slides, add stuff required for POC) | ||
* product positioning | |||
* architecture overview | |||
* documentation overview | |||
* ProofOfConcept (POC) planning | |||
** Goal: single-server OX-installation in existing target-environment | |||
= POC Installation = | = POC Installation = | ||
connected to existing mail-accounts and administered manually | connected to existing mail-accounts and administered manually |
Revision as of 10:35, 29 December 2011
clever stuff
insert bla here
Preparation / Questionnaire
(insert link to questionnaire here)
Initial Webcast
(polish existing slides, add stuff required for POC)
- product positioning
- architecture overview
- documentation overview
- ProofOfConcept (POC) planning
- Goal: single-server OX-installation in existing target-environment
POC Installation
connected to existing mail-accounts and administered manually (insert Link to article describing POC Requirements / Deliverables) 1. installed by customer
- link to install-documentation
- review-webcast
2. installed by OX
- requirements
- (remote) installation
- handover-webcast
Evaluation Period
Feedback Webcast
(approx. 4 weeks later)