EvaluationBestPractice: Difference between revisions
From Open-Xchange
Karsten.will (talk | contribs) No edit summary |
Karsten.will (talk | contribs) No edit summary |
||
Line 4: | Line 4: | ||
insert bla here | insert bla here | ||
= Preparation / Questionnaire = | |||
= Initial Webcast = | |||
= POC Installation = | |||
= Evaluation Period = | |||
= Feedback Webcast = | |||
* request Questionnaire (insert link here) | * request Questionnaire (insert link here) |
Revision as of 10:32, 29 December 2011
clever stuff
insert bla here
Preparation / Questionnaire
Initial Webcast
POC Installation
Evaluation Period
Feedback Webcast
- request Questionnaire (insert link here)
- initial webcast (polish existing slides, add stuff required for POC)
- product positioning
- architecture overview
- documentation overview
- ProofOfConcept (POC) planning
- Goal: single-server OX-installation in existing target-environment connected to existing mail-accounts and administered manually
(insert Link to article describing POC Requirements / Deliverables)
- setup the POC
1. installed by customer
- link to install-documentation
- review-webcast
2. installed by OX
- requirements
- (remote) installation
- handover-webcast
- customer evaluates the product
- feedback-webcast (approx. 4 weeks later)